EDgELEc 100pcs 3mm Red Lights LED Diodes (Red Lens) Diffused Round Lens 29mm Long Lead (Dc 2V) 100pcs Resistors (for Dc 6-12V) Included,Bulb Lamps Light Emitting Diode
$9.86
![](image/SSH_FS_icon.png)
Taxes will be calculated at Checkout.
US Delivery Time: 3-5 Business Days.
US Delivery Time: 3-5 Business Days.
Share This
Product Description
EDgELEc 100pcs 3mm Red Lights LED Diodes (Red Lens) Diffused Round Lens 29mm Long Lead (Dc 2V) 100pcs Resistors (for Dc 6-12V) Included,Bulb Lamps Light Emitting Diode
Low Energy consumption And Low Heat Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation Soldering condition (Manual Soldering):Less Than 3 Seconds With 482AF-527AF Soldering condition (Reflow Soldering):Less Than 5 Seconds With 500AF Storage conditions: Drying Preservation And Keep Away From Fire Or High Temperature get other LED models Please search EDgELEc DiodesFeatures of EDgELEc 100pcs 3mm Red Lights LED Diodes (Red Lens) Diffused Round Lens 29mm Long Lead (Dc 2V) 100pcs Resistors (for Dc 6-12V) Included,Bulb Lamps Light Emitting Diode
O1 Strong Magnetic PowerThe built-in super N52 Military grade magnets can strengthen the magnetic connection and ensure auto-alignment to make wireless Mag-safe charging faster and safer than before This iPhone 14 Magnetic case is compatible with all Qi-certified Mag-safe chargers, Mag-safe wallets, and car mounts Our iPhone 14 case will not fall, no matter how it shakes 360A Total Protection Our iPhone 14 Pro case features a combination of built-in loop airbag + four corner reinforced airbags It protects your iPhone 14 Pro from accidental drops, bumps and scratches Upgraded camera Protection Exquisite individual lens protectors precisely cover each lens without affecting night shots with flash Enhanced 9H level hardness provides strong protection against scratches and cracks Keeps camera lenses in top condition crystal clear & Not YellowingUsing high-grade germany Bayers ultra-clear TPU material, enjoying the original beauty of iPhone 14 Pro The Nano antioxidant layer effectively resist stains and sweat, not easy to get greasy and yellow over time, perfectly shows the original color of your phone clean and Dustproof There is a dustproof net at the bottom to prevent dust from entering the interior, causing the sound quality to deteriorate, prolonging the life of the phone, and can be removed for cleaning at any time after the dust is full, keeping your iPhone 14 Pro the original lookSpecification of EDgELEc 100pcs 3mm Red Lights LED Diodes (Red Lens) Diffused Round Lens 29mm Long Lead (Dc 2V) 100pcs Resistors (for Dc 6-12V) Included,Bulb Lamps Light Emitting Diode
Product Details | |
---|---|
Color | Blue |
Size | for iPhone 14 pro |
Dimensions | 0.13X0.12X1.3 |
Weight | 160 |
![Warning](https://electroeshop.com/image/catalog/warning65.png)
This product may contain chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.